News Item
Annual Spring Washdown Scheduled for State Street and Main Street Bridges
The City of Racine’s Department of Public Works, in collaboration with the Racine Fire Department, has scheduled the annual washdown of two downtown bridges:
-
State Street Bridge — Tuesday, April 29 from 8:00 a.m. to 12:00 p.m.
-
Main Street Bridge — Wednesday, April 30 from 8:00 a.m. to 12:00 p.m.
Temporary detours will be posted and in place during both operations. Residents and commuters are encouraged to plan alternate routes during those times.
The annual washdowns serve two essential purposes:
-
Debris Removal – Accumulated debris can offset the balance of the bridge span, impacting its proper function.
-
Salt Removal – Clearing residual salt from winter helps reduce long-term corrosion of the bridge’s steel structures.
These cleanings are part of the City’s ongoing commitment to maintaining safe and functional infrastructure.